Suggestion of Optimal Phased Evacuation Scenario Developing and Evaluating Methods for High-Rise Buildings

Article information

Int J Fire Sci Eng. 2025;39(2):148-163
Publication date (electronic) : 2025 June 24
doi : https://doi.org/10.7731/KIFSE.c14d95a5
Tokyo University of Science, 2641, Yamazaki, Noda, Chiba 278-8510, Japan
†Corresponding Author, E-Mail: mizuno@rs.tus.ac.jp
Presented at the 13th Asia-Oceania Symposium on Fire Science and Technology (Oct. 21-25, 2024, Daegu, Korea) & published in the Special Issue of the IJFSE.
Received 2025 February 27; Revised 2025 April 1; Accepted 2025 April 4.

Abstract

This research proposes methods for developing and evaluating optimal phased evacuation scenarios for high-rise buildings using the SimTread evacuation simulation to analyze conditions causing congestion and those capable of responding to mass evacuation start time fluctuations. Phased evacuation is essential to prevent congestion when all occupants simultaneously move to staircases during fires, which can delay evacuation from priority floors. The study aims to develop evacuation plans that satisfy three key conditions: 1) prioritizing evacuation of floors with high fire or smoke spread risk, 2) preventing heavy congestion in staircases, and 3) maintaining continuous evacuation flow at the first-floor exit despite time intervals between phases. To achieve these objectives, methodology was developed based on evacuation drills conducted in a 25-story office building in Tokyo and simulation results. The research determined that simultaneous evacuation of no more than 400 people per phase prevents heavy congestion. Additionally, appropriate time intervals between phases were established to maintain evacuation flow continuity. To evaluate the proposed methodology's validity, three indicators were developed: 1) Flow Status Indicator at First Floor Exit (RF), 2) Staircase Indoor Congestion Indicator on Each Floor (RC), and 3) Evacuation Time Index for Allowable Time According to Combustion and Smoke Propagation Risk (RS). Through case studies with different fire floor scenarios (lower, middle, and upper floors), the research confirmed the proposed methodology effectively develops and evaluates efficient phased evacuation scenarios for high-rise buildings. The findings contribute to enhancing evacuation safety in high-rise buildings by providing systematic methods for creating phased evacuation scenarios that balance priority evacuation, congestion prevention, and overall evacuation efficiency.

1. Introduction

The number of high-rise buildings is on the rise in large cities around the world with the development of architectural technology, and approximately 21,000 buildings with more than 10 floors above ground exist in Tokyo[1]. Because of the high-rise building structures, when a fire occurs, smoke may spread to stairwells or elevator shafts, it flows to the upper floors, and cause the casualties[2]. There is also a risk that a fire can be spread to upper floors through the windows such as Interstate Bank Building Fire in Los Angeles[3]. In high-rise buildings, stairs are commonly used as the main means of evacuation in case of fire. For example, according to a survey of 9/11 survivors in the United States, approximately 70% of the evacuees used stairs to escape[4]. In addition, 95.6% of respondents chose to evacuate the stairs before being explained about the safety of elevator evacuation, according to a survey conducted in high-rise buildings in China[5].

In the event of a fire in a high-rise building, if all the occupants begin to move to the staircases simultaneously, the staircase become crowded and the evacuation from the floors where the priority may be delayed. To avoid those matters, phased evacuation (an evacuation method is a systematic removal of people from a building) is used as an evacuation method in high-rise buildings. The advantages of phased evacuation are, first evacuate high-risk floors according to the fire floor, second avoid congestion inside the stairs, and third the total evacuation time can be quick. However, the disadvantage of the phased evacuation is that creating the evacuation scenario is difficult. The definition of a high-risk is not clear, and the number of evacuees or floors in each phase is not clear. The City of London has announced a policy of phased evacuation for high-rise office buildings to avoid congestion in the staircases and evacuate the floors with high evacuation priorities[6]. Also, research has been conducted on suggesting creating phased evacuation scenarios around the world, including Japan[7,8]. In Japan, Wada conducted a study aimed at developing a method to calculate the appropriate waiting time and evacuation target floor for each phase based on evacuation drills and surveys[8]. This method aims to reduce congestion in evacuation stairs and shorten the overall evacuation completion time while evacuating high-risk floors, but it does not specifically propose how to create an evacuation scenario and define high-risk floors. Unlike previous studies or policy that often focus on either theoretical models or calculating guidelines, this research uniquely integrates real evacuation drill data from a 25-story building with advanced SimTread simulation. Previous research by Wada[8] proposed methods to calculate appropriate waiting times between phases, but did not specifically define fire-risk floors or provide a comprehensive framework for creating and evaluating evacuation scenarios. Moreover, previous study by Marina[7] suggested a framework for creating evacuation scenario, but not detailed in assessment and calculating evacuation start time for each phase. This study bridges this gap by providing a complete methodology.

As for the target buildings that adopt phased evacuation in this study, the travel distance must be considered. According to evacuation drills in super high-rise buildings in China, Korea, the long-distance vertical evacuation was exhausting evacuees descending the stairways in the evacuation drills conducted in super high-rise buildings[9,10]. Those 2 evacuation drills showed that the descending velocity was decreased when evacuees walked down 40 floors or more. However, there was an evacuation drill conducted in Taiwan, and until descending 29th floor, the descending velocity was maintained[11], so it is also considered important to set up a target building that applies phased evacuation by stairs. In this study, the target high-rise building is limited to high-rise buildings 10-story or higher and 29-story (i.e. approximately 120 m converting to SI system with assumption that 1-story is 4.2 m) or below buildings. In addition, in Japan, According to Article 34 of the Building Standards Act, it is mandatory to install a fire emergency elevator in buildings over 31 m in height. Firefighters manage fire emergency elevators during emergencies for rescue and firefighting. This allows stairwell evacuation to focus on individuals without mobility impairments. Our study targets office buildings where elderly and children are rarely present. The few occupants with mobility impairments would be evacuated via fire emergency elevators under firefighter supervision, by Japanese emergency protocols.

This study proposes a method of phased evacuation plan for high-rise buildings based on the results of an evacuation drill conducted in a 25-story high-rise office building in Tokyo. The proposed phased evacuation plan satisfies following conditions. 1. The high-risk floors has priorities to evacuate. 2. Heavy congestion is prevented to occur in the staircase. and 3. The evacuation flow at the first floor shall not be stopped due to time interval between phases. To create the aiming phased evacuation scenarios, Ⅰ. The number of evacuees that evacuating simultaneously without causing the heavy congestion will be defined. Ⅱ. The evacuation scenario creating method will be suggested. Ⅲ. The evaluating the evacuation scenario will be suggested. and Ⅵ. The case study for validity will be done. In this study, the purpose is suggesting the methods of creating phased evacuation scenarios and evaluating the evacuation scenarios. To achieve this purpose, evacuation simulation SimTread[12] was used for Ⅰ, Ⅲ, and Ⅵ, and evacuation drill results were used for creating evacuation scenarios[13].

2. Research Overview

2.1 The definition of high-rise buildings and the subject of evacuation plans

In Japan, high-rise buildings are defined by the Article 8-2 of the Enforcement Decree of the Fire Protection Act, buildings exceeding 31 m in height are defined as high-rise buildings. The previous survey of evacuation drills in super high-rise buildings for complex purposes (101 and 63-story, respectively), the walking speed at the time when the stairs were lowered by approximately 40 floors was the lowest by the long-travel distance, but in the other study, the evacuation drill conducted in a different super high-rise building, the walking speed was maintained until evacuees descended 29 floors. Accordingly, the high-rise buildings adapting the phased evacuation plan proposed in this study is a high-rise building that exceeds 31 m and is less than 29 floors, that is, about 120 m in height (converted to 4.2 m in the height of the reference floor). In addition, it should be noted that according to the Building Standard Law Enforcement Order Article 13-3, Paragraph 5 in Japan, 'On the evacuation floor, the walking distance from the entrance of the emergency elevator shaft (or the entrance of the boarding lobby if structured as specified in paragraph 3) to one of the exits to the outside (limited to parts adjacent to roads, passages with a width of 4 meters or more leading to roads, open spaces, or similar) must be 30 meters or less.' This regulation ensures that there is minimal time difference for evacuees entering stairwells. Thus, in this research, vertical evacuation is mainly mentioned in, and the horizontal evacuation is included in the time evacuees arrived to the staircase.

2.2 The aimed phased evacuation scenario

The phased evacuation scenario proposing in this study should take the advantages of the phased evacuation and abandon the disadvantages. Thus, the phased evacuation scenario should satisfy following conditions.

1. Prevent heavy congestion in the staircase. The heavy congestion in this study is defined by the duration of a condition that evacuation flow rate decreases to 0.125 p/s (1 person per 8 seconds) or less for more than 5 minutes, and when the flow rate increases to more than 0.125 p/s (1 person per 8 seconds), it refers the end of congestion. There was a survey conducted after the evacuation drill, and 50% of evacuee answered that over 3 minutes of congestion to descend a floor, it was intolerable[8]. Thus, in this study, 5 minutes of congestion is defined as the heavy congestion.

2. Prevent the evacuation flow at the exit of the first floor stops, and total evacuation time delayed. The phase time interval shouldn’t be too broad and causes the evacuation flow stopping at the exit of the first floor to increase the evacuation efficiency. In the evacuation drills conducted in the previous research, merging in a range where congestion does not occur helped to maintain high flow rate[13].

3. Evacuate floors with high-risk of fire or smoke spread. The floor with a high risk of fire spread is 4 floors directly above the fire floor, referring to the fire spread from the 12th to 16th floors in the fire at Interstate Bank building in Los Angeles City in 1988[3]. The floors with a high risk of smoke spread are 20% of floors in the number of floors between a fire floor and top floor, and 20% of floors in the number of floors between a fire floor and a floor where the elevator bank exists. The floors with a high risk of smoke spread refers to exposure to smoke by stack effect through stairwells and elevator shafts in case of fire. Such as fires in high-rise buildings Grenfell tower fire, MGM Grand Hotel fire, those fires show smoke may spread to higher floors if the fire grows enough.

3. Evacuation Drill[13]

3.1 Evacuation drill overview

In this study, the evacuation drills that adopted the phased evacuation scenarios are analyzed to find the crowd reached the staircase for the creating evacuation scenarios. The evacuation drills were conducted in a building with 3 basement floors and 25 floors above the ground in Tokyo from 2015 to 2018. In the building, offices on the 10th floor or higher, and conference rooms, machine rooms, and cafeterias were located on the 9th floor or lower, so the major evacuees existed on the 10th floor or higher, and the staircases were in north and south sides. The dimensions of the staircase are shown in Figure 1. In addition, Table 1 shows the number of people participated the evacuation drill and, in each year, the participants were 1672, 1183, 1064, and 965 people.

Figure 1.

The staircase plan.

The Number of Occupants on Each Floor from 2015 to 2018

3.2 Evacuation scenario of the drills

According to the evacuation scenario shown in Figure 2, the evacuation training was conducted by setting the fourth floor as the fire floor. In 2015, the first phase was the fire floor and the 2 floors directly above, and after that, the 7th to 12th floors and the 21st to 25th floors were set as the second phase, and the 3rd and 13th to 20th floors were designed as the 3rd phase, and the 2nd floor was set as the 4th phase with underground floors. However, the 3rd phase in 2015 had 800 people in 8 floors, and the phase time interval was not enough to avoid the heavy congestion. Thus, from 2016 to 2018, as shown in Figure 2(b), the 3rd phase in 2015 was divided into 2 phases, and the 3rd phase was set from 17th to 20th floors, and the 13th to 16th floors were set as the 4th phase in 2015. From 2016, this reduced congestion duration and controlled the time interval within the phases while preventing the flow of evacuation stopping at the final exit.

Figure 2.

Evacuation scenarios from 2015 to 2018.

3.3 Crowd evacuation start time in evacuation drill

Table 2 shows the number of occupants of each floor obtained from evacuation drills from 2015 to 2018, and the crowd entering time to the staircase from each phase. Here, the crowd refers to an evacuation flow in which the evacuation flow was more than 30 people not stopped for more than 3 seconds. In addition, the crowd entering time to the staircase from each phase in this study is mass evacuation.

Crowd Evacuation Start Time

The average mass evacuation start time is 117.3 seconds, and the standard deviation is 23.6 seconds (Table 2). The mass evacuation start time represents the evacuation start time, in seconds (s), and ranges from 0 to 300 seconds. The Y-axis (PDF) probability density function is represented, and the PDF represents the probability of occurrence in a particular interval. Histogram (Gray) Shows the distribution of evacuation start times based on evacuation training data. The height of each bar represents the frequency of evacuation start times for a specific interval. The red curve (PDF) represents a probability density function (PDF) based on histogram data. The curve continuously shows how often the evacuation start time occurs in a particular interval. The green curve represents the normal distribution, and shows the theoretical distribution when the data follow the normal distribution.

Looking at the evacuation start time distribution, most evacuation start times are distributed between about 50 and 200 seconds. The evacuation start time occurs most frequently between 100 and 150 seconds. The probability density function (PDF) represents a continuous probability distribution based on histogram data, and the maximum value of the PDF means that it occurs most frequently at about 100 seconds. The normal distribution looks similar to the distribution in the histogram, but is slightly different. The normal distribution is similar to the histogram, but has higher peak values, and there are areas where both tails do not match the histogram data (Figure 3).

Figure 3.

Average crowd evacuation start time.

4. Analysis of Conditions Causing the Heavy Congestion by SimTread

4.1 Improved SimTread

The evacuation simulation SimTread used in this study to analyze evacuation flow and conditions causing the heavy congestion was improved one by comparison with the evacuation drill to evaluate the reproducibility of crowd evacuation flow and improved its reproducibility[14].

SimTread has been officially certified by the Tokyo Fire Department as an approved evacuation simulation method for their "Excellent Fire Prevention Property Certification System" since November 2010, which demonstrates its credibility and reliability in fire safety applications. In addition, as a plugin for CAD software VectorWorks, SimTread offers seamless integration with architectural design processes. This integration is particularly valuable in Japan, where SimTread is widely utilized not only for building fire prevention but also across various fields including architectural design, urban planning, and facility management, making it a practical tool for both research and real- world applications. Additionally, while other evacuation simulations have limitations in freely adjusting pedestrian parameters, SimTread provided a significant advantage as one of our co-researchers was among its developers. This allowed us access to developer-level controls for modifying model parameters with greater flexibility than typically available, enabling precise calibration to match observed evacuation behaviors.

When stairwell width is constant and evacuees move continuously, evacuation flow characteristics remain consistent. Due to the constraints of time and frequency in conducting multiple evacuation drills in an office building, we utilized SimTread evacuation simulation. To improve simulation accuracy, we compared results with actual evacuation drill data and adjusted the original stairwell model and pedestrian model such as doorway widths, conflict determination areas, intermediate landing configurations, and agent personal spaces. These adjustments reduced the error rates in the following three aspects: 1) Error rate of flow rate on the landing (inflows and outflow) during merging: reduced from 11% to approximately 3% after calibration, 2) Density error rate: the maximum density at the stair landing during merging decreased significantly from 55% to approximately 1% after calibration, and 3) Error rate of total evacuation time: reduced from 3.4% to 1.2% after calibration.

The SimTread prediction accuracy was improved through following methods

1. Door width adjustment: Because the merge rate at stairwell entrances differed between simulation and actual evacuation drills, the researchers adjusted door widths to reproduce realistic merging flows. They tested various widths (800 mm, 850 mm, and 900 mm) to find the optimal setting.

2. Conflict determination area modification: They expanded the forward distance and width of the conflict determination area that agents use to avoid other agents, resulting in more natural evacuation flow patterns.

3. Intermediate landing area improvement: To address bottleneck issues occurring at intermediate landing points below the 5th floor, they modified these areas to be consistent with other intermediate landings.

4. Agent personal space expansion: They expanded the personal space of agents during and after merging to match densities observed in actual evacuation drills. Specifically, they adjusted parameters such as setting the forward distance to 1049 mm under normal situations.

Through these improvements, the researchers reduced the error rate between simulation results and actual evacuation drills from 3.4% to 1.2%, enabling more accurate predictions of evacuation times and flow patterns.

4.2 Conditions causing the heavy congestion in the staircase

In the previous study of evacuation drills, the evacuation drill conducted in 2015 showed that 800 evacuees evacuated and there was a heavy congestion[13]. To analyze the congestion situation, 800 evacuees evacuated simultaneously from 5 to 10 floors according to the Table 3.

Congestion Occurring Conditions in Patterns

Table 3 shows the 800 evacuees distributed floors they evacuate simultaneously in multiple patterns. P.1 to P.5 are patterns those evacuees distributed in each number of floors. P.1 distributed evacuees with the same numbers. P.2 and P.4 distributed evacuees focused on higher floors, and P.3 and P.5 are the opposite way to distribute.

In Table 4, there were the results of the congestion durations in patterns using SimTread. When evacuees moved from 4 floors at the same time, there was no heavy congestion. In the results, P.2 and P.4 which distributed evacuees focused on higher floors had low congestion duration, but P.3 and P.5 which distributed evacuees focused on lower floors had longer congestion duration. The congestion durations of P.3 and P.5 were longer than P.1’s congestion time, and P.3 had longer congestion times than P.5’s congestion time. The result shows that when lower floors have more evacuees in the same phase, the congestion inside of the phase may be increased. Thus, when creating an evacuation scenario, in a phase, lower floors should not have many numbers.

Congestion Durations in Patterns

In order to, create a phased evacuation scenario in which the heavy congestion does not occur, it is necessary to define the congestion time for the number of evacuees in one phase. Figure 4 shows the trend of the congestion duration decreasing for the number of evacuees decreasing in the number of floors where they evacuate simultaneously. The number of evacuees were 750 to 400 and decreased by 50 people. In addition, the distribution of evacuees were followed by P.3 in Table 3.

Figure 4.

Congestion duration based on the number of evacuees in one phase.

According to the results of Figure 4, to determine the number of evacuees in an appropriate phase, the number of evacuees with a congestion time of 2 minutes and 3 minutes was set. As for the number of evacuees, the case of simultaneous evacuation on the 6th floor with the longest congestion time was adopted. Therefore, 400 people (≈398 people) and 467 people were set for each phase.

In this study, one purpose is to maintain a high flow rate at the exit of the first floor, and for this purpose, the leading evacuee of the n phase must be able to move to the rear of the evacuee of the n-1 phase. However, as shown in Figure 3, the start time of crowd evacuation is distributed. To control this, it is necessary to advance the evacuation time from the second phase. The probability density function in Figure 3 is not a normal distribution, but is calculated after assuming a normal distribution to obtain the difference between the two independent probability density functions. At this time, since the standard deviation is doubled, the standard deviation is 34 seconds, and the start time of the n phase is advanced by 34 seconds, and the evacuation time of all phases is started by 34 seconds, thereby maintaining a high flow rate at the exit of the first floor. In order to determine whether the congestion time could be suppressed within 5 minutes, the result of 2 minutes and 3 minutes of congestion time was calculated along with 4 phases advanced by 34 seconds. In addition, a case in which the evacuation time of 2 σ was advanced was also calculated to determine whether it was possible to respond to the faster start of any phase.

In both Figures 5 and 6, there was no congestion. However, in the case of Figure 5 (400 people simultaneous evacuation), the congestion time was less, and it is determined that it is possible to respond to the urgent entry of other evacuees into the stairwell against the sudden transmission of smoke, so one phase is set to 400 or less.

Figure 5.

Congestion situations when each phase advanced by 34 seconds (left), and 2 σ (additional 68 seconds) (right) and each phase the number of evacuees were 400 people.

Figure 6.

Congestion situations when each phase advanced by 34 seconds (left), and 2 σ (additional 68 seconds) (right) and each phase the number of evacuees were 467 people.

5. Suggestion of Method and Evaluation Method for Phased Evacuation Scenario

5.1 Method of creating phased evacuation scenario

The method of writing a phased evacuation scenario of the goal is as follows.

•The upper floor of the fire floor

- Ph.1: The fire floor and the two floors directly above

- Ph.2: 2 floors just above the Ph.1, 2 of top floors of the elevator bank, 2 of top floors of the building

- From Ph.3: Floors with high risk of smoke spread

After evacuation from floors above the fire floor, floors lower than the fire floors evacuate.

The number of floors and personnel of each phase is determined to 400 people, except the Ph.2.

5.2 Method of calculate the evacuation start time at each stage

Since the evacuation completion time of each phase is divided by the number of people [p] of the phase divided by the flow amount [p/s] of LT because the end width of the stairwell is limited, the evacuation completion time of each phase can be expressed by the following equation.

(1) Tevac-ph.n=Tcom-ph.n-1-Tr+TLT±TLT-ph.n+1+Tevac [s]

Here, Tcom_ph.n-1 is the evacuation completion time of the previous phase, Tr is the response time, and the time when the crowd arrives at the stairwell after the evacuation start broadcast. TLT is the time to arrive at LT from the stairwell door, and is the distance from the door to LT divided by the moving speed. TLT-ph.n+1 is the distance between the LTs of both lowest floor divided by the moving speed because the end of the n-1 phase is attached to the head of the n phase, according to the position of the n phase. If the n-1 phase is located above the n phase, it is more because the travel time is required until the end of the n-1 phase passes through the LT of the n-1 phase, but if the n-1 phase is below the n phase, the travel time is taken so that the end of the n-1 phase follows the N-1 phase. T_evac is the evacuation time, and the number of people in the n phase divided by the flow rate of the LT. In addition, Tevac is the evacuation time of the phase.

5.3 Method of evaluating the evacuation scenario

5.3.1 Flow status indicator at first floor exit RF

The time integration of the ratio of the flow F(t) [p/s] at the time t [s] from the start time of evacuation (lapse time 0 seconds) to the time of evacuation completion t [s] for the target flow FTarget [p/s] flowing out of the first-floor stair exit is defined as RF [-] divided by the evacuation completion time te. Here, the target flow rate is 80 passers (1.33p/s) for 60 seconds, and this indicator indicates that the evacuation flow at the first-floor exit is cut off by the time interval between phases or the flow rate decreases (Figure 7 Left). In addition, when the score of RF is below 50, the time interval among phases must be changed.

Figure 7.

Indicators of evacuation situations.

5.3.2 Staircase indoor congestion indicator on each floor RC

Depending on the duration of the congestion state of the nth floor (evacuation flow from landing to tread, is less than 0.125 p/s equivalent to one pass in 8 seconds), the total number of floors NC in the floor not exceeding 3 minutes and not exceeding 5 minutes is calculated by dividing the number of floors NA and F above the ignition system of the building by the value RC [-] excluded from 1. In addition, for evacuation scenarios where the required RC is less than 0.3, a warning is greater than 0.3 and less than 0.5, an improvement is recommended, and an improvement in evacuation scenarios is required without allowing more than 0.5. Here, the criteria of 3 and 5 minutes are cited in the survey results on the downtime caused by congestion inside the stairs. According to the survey results after evacuation training, it is about 55%, based on the response that about 55% of respondents said they could not tolerate a stay of up to 3 minutes, but a stay of more than 3 minutes. In addition, a stay is defined as an evacuation flow down from a change to landing being less than one person per 8 seconds (0.125 p/s) (Figure 7 Middle). In addition, when there is a floor having a heavy congestion (5 minutes exeeded), the evacuation scenario must be changed.

5.3.3 Evacuation time index for allowable time according to the risk of combustion and smoke propagation RS

The ratio of the floor evacuation times te and n [s] to the floor evacuation times te and n [s] determined by the fire prevention performance of the opening such as the living room of the ignition system and the conditions of the elevator landing on each floor is obtained by dividing the number of floors NS corresponding to 0.5 to 1 by the number of floors N above the ignition system of the building, and the value is defined as RS [-]. The allowable time for each floor is set according to the performance of the opening of the ignition system living room, etc. If the opening is a fire prevention facility, the allowable time for the upper layer than the ignition system is 20 minutes, and for the floor having a higher risk of spreading smoke is 10 minutes. On the other hand, in the case of specific fire prevention facilities, 60 minutes and 30 minutes are the same. Evacuation scenarios with an RS of 0.7 or more are allowed, warnings of 0.4 or more and less than 0.7 are recommended to improve the scenario, and evacuation scenarios of less than 0.4 are not allowed and are required to be improved (Figure 7 Right). In addition, when a floor or more evacuate later than allowed time, the evacuation scenario must be changed.

6. Case Study: Creating the Phased Evacuation Scenario and Evaluating of It

6.1 Creating phased evacuation scenarios by a fire floors

In performing this case study, the building to be analyzed is a building on which evacuation training has been conducted, and the evacuees are arranged in 400 people each on the office floor and 200 people on the other floor. At this time, it is a scenario in which each evacuation staircase moves in half. In addition, the fire floors divided into the lower floor, the middle floor, and the upper floor to create evacuation scenarios corresponding to each fire floor. The fire floors were 4th, 13th, 20th floors respectively (Figure 8).

Figure 8.

Evacuation scenario based on fire floors.

According to the number of evacuees suppressing the heavy congestion, each phase need to be 400 people or less, but in the lower fire floor evacuation scenario, the Phase 2 was the exception that may have more than 400 people. It is because of that the main purpose of the phased evacuation was evacuating the high-rise floors, so the Phase 2 in the lower fire floor evacuation scenario had more 600 evacuees. In addition, in Figure 8(b), the Phase 7 to 9 had 3 floors in each. It was because of that if 4 floors were set as one phase, the last phase would be 1 floor evacuating. Thus, to have the balance, 3 floors were set as one phase, and it is not breaking the rules.

6.2 Evaluating phased evacuation scenarios

In the evaluation of the evacuation scenario, the lower floor fire scenario was evaluated. It is because of that the lower floor fire scenario has the risk of the heavy congestion occurrence, and the highest risk of smoke spread.

As shown in Figure 9, there was no interruption in the flow of the evacuation flow on the first floor and the RF was 0.91 what shows the evacuation efficiency was high. There was not the heavy congestion inside the evacuation stairwell during evacuation. In addition, it was confirmed that the evacuation of the high-risk floors, which is the biggest purpose of the phased evacuation, was safely completed within the floor allowed evacuation time without delay.

Figure 9.

Evaluation lower fire floor evacuation scenario.

7. Conclusions

A method of creating an optimal phased evacuation scenario was proposed based on evacuation drill and evacuation simulation, and an evacuation scenario evaluation method was also proposed to understand the validity of the created evacuation scenario. In addition, the validity of the evacuation scenario proposed in this study was confirmed through a case study.

8. Limitations and Future Research

This study focused specifically on high-rise office buildings with 29 and less stories, where stair-based evacuation remains the primary strategy. This threshold of 29 floors was selected because no significant decrease in movement speed has been observed in buildings below this height, making it appropriate to target buildings of approximately 120 meters in height[11]. The proposed phased evacuation methodology has several contextual limitations that should be acknowledged.

Phased evacuation requires occupant familiarity through regular evacuation drills, making it most suitable for buildings with stable occupancy patterns like offices, rather than facilities with unspecified occupants such as hotels or commercial centers.

For super high-rise buildings exceeding 30 stories, different evacuation approaches incorporating evacuation elevators and refuge areas would be necessary due to physical fatigue factors and extended vertical travel distances.

Future research should extend this methodology to address these different building configurations, particularly exploring the integration of stair-based phased evacuation with elevator evacuation strategies and refuge areas in super high-rise buildings.

Notes

Author Contributions

[SeongKyung Park]: Methodology, Formal analysis, Investigation, Data curation, Writing - original draft, Visualization. [Masayuki Mizuno]: Conceptualization, Resources, Supervision, Project administration, Funding acquisition, Writing - review & editing. All authors have read and agreed to the published version of the manuscript.

Conflicts of Interest

Conflicts of Interest: The authors have no conflicts of interest to declare that are relevant to the content of this article.

Acknowledgments

The authors received Grant-in-Aid for JSPS Fellows Grant Number 22J13643 of this article, and the data collection of the evacuation drill was supported by Grant-in-Aid for Scientific Research (C) of JSPS KAKENHI Grant Number 17K06722.

References

1. Statistics of Tokyo. Number of Buildings with Four or more Floors and Underground Floors https://www.toukei.metro.tokyo.lg.jp/tnenkan/2019/tn19q3i003.htm.
2. Bourgeois J. A.. Smoke and Fire. Academic Psychiatry 32517. 2008. https://doi.org/10.1176/appi.ap.32.6.517.
3. United States Fire Administration. Technical Report Series: Interstate Bank Building Fire Los Angeles, California 1988;
4. McConnell N. C., Boyce K. E., Shields J., Galea E. R., Day R. C., Hulse L. M.. The UK 9/11 Evacuation Study: Analysis of Survivors’ Recognition and Response Phase in WTC1. Fire Safety Journal 45(1):21–34. 2010;https://doi.org/10.1016/j.firesaf.2009.09.001.
5. Ding N., Zhang H., Chen T.. Experimental Study of Egress Selection Behavior Between Stairs and Elevators During High- Rise Building Evacuation. Fire Technology 55(5):1649–1670. 2019;https://doi.org/10.1007/s10694-019-00822-y.
6. LFB (London Fire Brigade). Phased Evacuation of Office Building 1991;
7. Marina G., Ivan D., Kirill K.. Phased Evacuation Algorithm for High-Rise Buildings. MATEC Web of Conferences 245(190)2018;https://doi.org/10.1051/matecconf/201824511012.
8. Tetsuya W., Ai S.. Study on Estimation Method of Optimum Phased Evacuation Plan in a High-Rise Building. Bulletin of Japan Association for Fire Science and Engineering 66(3):31–40. 2016;https://doi.org/10.11196/kasai.66.3_31.
9. Ma J., Song W. G., Tian W., Lo S. M., Liao G. X.. Experimental Study on an Ultra High-Rise Building Evacuation in China. Safety Science 50(8):1665–1674. 2012;https://doi.org/10.1016/j.ssci.2011.12.018.
10. Back M. H., Shin H. J.. A Study on the Emergency Stairway Evacuation of Skyscraper. Journal of the Korean Society of Hazard Mitigation 10(4):55–62. 2010;
11. Wu G. Y., Mizuno M., Ke C. K.. Study on Mass Evacuation During Fire Drills in a Stairwell of Super High-Rise Buildings. Bulletin of Japan Association for Fire Science and Engineering 67(2):93–105. 2017;https://doi.org/10.11196/kasai.67.2_93.
12. Kimura T., Sano T., Hayashida K., Takeichi N., Minegishi Y., Yoshida Y., Watanabe H.. Representing Crowds Using a Multi-Agent Model - Development of the SimTread Pedestrian Simulation System. Japan Architectural Review 2(1):101–110. 2019;https://doi.org/10.1002/2475-8876.12073.
13. Park S. K., Mizuno M., Fujii K., Kadokura H., Sano T., Tanaka T., Sekizawa A.. Improvement of Phased Evacuation Scenario Based on Analyses of Pedestrian Flow in Stairwell During Drills in High-Rise Office Building - Possibility of Real-Time Technique for Facilitation of High-Rise Building Evacuation -. Life Support Journal 32(4):118–125. 2020;https://doi.org/10.5136/lifesupport.32.118.
14. Park S. K., Wu G. Y., Fujii K., Mizuno M.. Improving Precision of Evacuation Simulation: A Comparative Analysis Between Evacuation Drill and SimTread Simulation Results. Indoor and Built Environment 33(9)2024;https://doi.org/10.1177/1420326X241261655.

Article information Continued

Figure 1.

The staircase plan.

Figure 2.

Evacuation scenarios from 2015 to 2018.

Figure 3.

Average crowd evacuation start time.

Figure 4.

Congestion duration based on the number of evacuees in one phase.

Figure 5.

Congestion situations when each phase advanced by 34 seconds (left), and 2 σ (additional 68 seconds) (right) and each phase the number of evacuees were 400 people.

Figure 6.

Congestion situations when each phase advanced by 34 seconds (left), and 2 σ (additional 68 seconds) (right) and each phase the number of evacuees were 467 people.

Figure 7.

Indicators of evacuation situations.

Figure 8.

Evacuation scenario based on fire floors.

Figure 9.

Evaluation lower fire floor evacuation scenario.

Table 1

The Number of Occupants on Each Floor from 2015 to 2018

The number of occupants on each flooor
Floor 2015, Total 1672 persons 2016, Total 1183 persons 2017, Total 1064 persons 2018, Total 965 persons
Ph.1 Ph.2 Ph.3 Ph.4 Ph.1 Ph.2 Ph.3 Ph.4 Ph.1 Ph.2 Ph.3 Ph.4 Ph.1 Ph.2 Ph.3 Ph.4
25 0 1 3 1
24 91 73 47 33
23 30 4 15 15
22 43 17 17 2
21 113 57 19 39
20 57 30 21 33
19 23 27 16 11
18 131 8 76 40
17 216 162 120 162
16 37 79 38 41
15 22 21 25 17
14 139 116 92 21
13 238 151 224 189
12 209 149 116 155
11 155 91 72 64
10 94 124 99 86
9 2 22 17 23
8 2 5 2 0
7 0 1 1 0
6 10 1 0 0
5 15 8 10 11
4 15 20 15 12
3 28 13 13 9
2 2 3 6 1
Total 40 739 863 30 29 544 243 367 25 408 252 379 23 418 256 268

Table 2

Crowd Evacuation Start Time

2015 Evacuees [p] Crowd entergin time to the staircase from evacuation starting announcement of each phase [s] 2016 Evacuees [p] Crowd entergin time to the staircase from evacuation starting announcement of each phase [s]
24F 90 129 17F 162 127
21F 1081 16 16F 79 175
12F 209 105 14F 116 163
22F 146 89 13F 151 101
10F 91 131 12F 149 135
11F 91 134
10F 124 114
2017 Evacuees [p] Crowd entergin time to the staircase from evacuation starting announcement of each phase [s] 2018 Evacuees [p] Crowd entergin time to the staircase from evacuation starting announcement of each phase [s]
17F 120 87 17F 160 101
14F 92 105 13F 189 107
13F 224 85 12F 155 118
12F 116 75 11F 64 108
11F 72 118 10F 86 135
10F 99 139
Average crowd evacuation start time from each phase’s announcement started: 117.26 s (±23.59) ※Crowd evacuation is defined to the evacuation flow made of 30 evacuees and more that doesn’t stop longer than 3 s

Table 3

Congestion Occurring Conditions in Patterns

4F 5F 6F 7F
P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5
115 200 29 160 80
134 230 38 178 89 115 171 57 160 80
160 267 53 229 114 134 190 76 178 89 114 143 86 160 80
200 320 80 267 133 160 213 107 229 114 133 152 114 178 89 114 114 114 80 80
200 240 160 267 133 160 160 160 114 114 133 114 152 89 178 114 86 143 80 160
200 160 240 133 267 160 107 213 114 229 133 76 190 89 178 114 57 171 80 160
200 80 320 133 267 160 53 267 114 229 133 38 230 89 178 114 29 200 80 160
800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800
8F 9F 10F ※Note
P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5 The total evacuee number evacuated simultaneously
80 145 15 107 53
89 160 18 124 61 80 131 29 107 53 The floor number evacuated simultaneously
100 178 22 150 50 89 142 36 124 61 80 116 44 107 53
100 156 44 150 50 89 124 53 124 61 80 102 58 107 53 The number of evacuees in each floor
100 133 67 150 50 89 107 71 123 61 80 87 73 107 53
100 111 89 150 50 89 89 89 61 61 80 73 87 53 107 Patteren 1, 2, 3, 4, and 5
100 89 111 50 150 89 71 107 61 124 80 58 102 53 107 P.1: the same number of evacuees on all floors
P.2, and 4: different numbers of evacuees concentrate on higher floors
P.33, and 5: different numbers of evacuees concentrate on lower floors
100 67 133 50 150 89 53 124 61 124 80 44 116 53 107
100 44 156 50 150 89 36 142 61 124 80 29 131 53 107
100 22 178 50 150 88 18 160 61 123 80 15 145 53 107
800 800 800 800 800 800 800 800 800 800 800 800 800 800 800

Table 4

Congestion Durations in Patterns

5F 6F 7F
P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5
349 243 407 169 350 364 227 418 178 417 330 154 347 155 469
8F 9F 10F
P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5 P.1 P.2 P.3 P.4 P.5
309 152 330 209 314 354 245 367 265 326 315 228 378 258 314